When finishing up a design after doing the toolpaths I look at the time estimate and it says 27 hours or so but when I cut it it is done in 2-3 hours. I have checked all the feedrates on the bits and looked at the rapid rates but I am at a loss as to why the software overestimates so badly. Anyone have any tip on what setting I have off that causes this?
- Rcnewcomb
- Vectric Archimage
- Posts: 5920
- Joined: Fri Nov 04, 2005 5:54 am
- Model of CNC Machine: 24x36 GCnC/WinCNC with ATC
- Location: San Jose, California, USA
- Contact:
Re: Time estimate ?
- Randall Newcomb
10 fingers in, 10 fingers out, another good day in the shop
10 fingers in, 10 fingers out, another good day in the shop
Re: Time estimate ?
Reduced the scale to 1 but unless I triple the feed rate for the bit the time estimate is grossly overestimated.
Ex. Finish 3D pass that was done in 6 hours was estimated at 23hr 45m only way to get the software to get a close estimate was to triple the feed rate from 30inches/min to 90
Is the time estimator just junk?
Ex. Finish 3D pass that was done in 6 hours was estimated at 23hr 45m only way to get the software to get a close estimate was to triple the feed rate from 30inches/min to 90
Is the time estimator just junk?
- mtylerfl
- Vectric Archimage
- Posts: 5895
- Joined: Thu Jan 29, 2009 3:54 am
- Model of CNC Machine: -CarveWright CNC -ShopBot Buddy PRSAlpha
- Location: Brunswick, GA
Re: Time estimate ?
It's up to you to set the appropriate Scale Factor for the particular job (3D, 2D, or combinations thereof)
This topic has been covered many times. Rather than re-telling all the "how-to's", try doing a forum search to find older posts that will be helpful for you.
This topic has been covered many times. Rather than re-telling all the "how-to's", try doing a forum search to find older posts that will be helpful for you.
Michael Tyler
facebook.com/carvebuddy
-CarveWright CNC
-ShopBot Buddy PRSAlpha CNC
facebook.com/carvebuddy
-CarveWright CNC
-ShopBot Buddy PRSAlpha CNC
- Adrian
- Vectric Archimage
- Posts: 14660
- Joined: Thu Nov 23, 2006 2:19 pm
- Model of CNC Machine: ShopBot PRS Alpha 96x48
- Location: Surrey, UK
Re: Time estimate ?
I've never heard of the estimate being way too slow when using a scale factor of 1. Normally it needs a scale factor of 3 to get it close on 3D work.
Are you sure the feed rate units you're using are correct? The more complex the job (3D work, lots of small parts etc) that stop the machine reaching the programmed speeds the more out the estimate will be (hence the scale factor) but, as I say, it's the other way around from what you seem to be saying.
Are you sure the feed rate units you're using are correct? The more complex the job (3D work, lots of small parts etc) that stop the machine reaching the programmed speeds the more out the estimate will be (hence the scale factor) but, as I say, it's the other way around from what you seem to be saying.
-
- Vectric Wizard
- Posts: 1013
- Joined: Fri May 15, 2015 1:10 pm
- Model of CNC Machine: 3 axis small size machine
- Location: France
Re: Time estimate ?
Most CAM simply calculate the estimated time by dividing the length of the toolpath by the speed. They simply distinguish the type of move (cutting, plunge, quick move).
As they don't take into account accelerations, decelerations and the fact the machine can't reach the theoretical speed on short moves, the time calculation is by definition ALWAYS smaller than reality.
If it is not, there is a glitch somewhere. A unit error as Adrian suggested or some parameter in your control software which makes the machine go faster than you asked.
As they don't take into account accelerations, decelerations and the fact the machine can't reach the theoretical speed on short moves, the time calculation is by definition ALWAYS smaller than reality.
If it is not, there is a glitch somewhere. A unit error as Adrian suggested or some parameter in your control software which makes the machine go faster than you asked.
Best regards
Didier
W7 - Aspire 8.517
Didier
W7 - Aspire 8.517
- martin54
- Vectric Archimage
- Posts: 7352
- Joined: Fri Nov 09, 2012 2:12 pm
- Model of CNC Machine: Gerber 48, Triac PC, Isel fixed gantry
- Location: Kirkcaldy, Scotland
Re: Time estimate ?
You have used the max rapid rates from your control software (what ever that is) when you set the estimator up the first time haven't you ?
For 3D work mine is normally set about 2 or 3 depending on the job, have to be honest though & say I don't both to check a lot of the time as machining time is not a factor for me with what I do with the machine most of the time
For 3D work mine is normally set about 2 or 3 depending on the job, have to be honest though & say I don't both to check a lot of the time as machining time is not a factor for me with what I do with the machine most of the time
- Rcnewcomb
- Vectric Archimage
- Posts: 5920
- Joined: Fri Nov 04, 2005 5:54 am
- Model of CNC Machine: 24x36 GCnC/WinCNC with ATC
- Location: San Jose, California, USA
- Contact:
Re: Time estimate ?
If the Rapid Rate is set incorrectly that can cause the estimates to be too long.I've never heard of the estimate being way too slow when using a scale factor of 1
Here is the estimate with the rapid rate of 6 inches per second: 01:36:07 And here is the estimate with the Rapid Rate set to 6 millimeters per minute: 11:01:45
- Randall Newcomb
10 fingers in, 10 fingers out, another good day in the shop
10 fingers in, 10 fingers out, another good day in the shop