have not used my cnc shark for a few months and completed a new project. In the vcarve project the run time is 4:37 but when I load the g code from the control panel it says 23:38. It will go to the first hole to drill but after it drills that hole It does not go to the next one until It has drilled the first one 4 or 5 times. Max depth is .080 but it is traveling down each time it stays at that hole.I have checked everything I can think of to see if I unknowingly changed something. I have loaded another project and that runs fine.Thanks
By mistake I deleted this post. Lets try again .http://www.vectric.com/forum/download/f ... w&id=23716
Run time gone haywire
-
- Posts: 14
- Joined: Thu May 05, 2011 1:17 am
- Model of CNC Machine: cnc shark pro
Run time gone haywire
- Attachments
-
- JE 500 fp forum crv.crv
- (1.65 MiB) Downloaded 132 times
-
- Vectric Wizard
- Posts: 4797
- Joined: Thu May 18, 2006 3:24 pm
- Model of CNC Machine: ShopBot
- Location: North Carolina
Re: Run time gone haywire
I just responded in your other post
-
- Posts: 14
- Joined: Thu May 05, 2011 1:17 am
- Model of CNC Machine: cnc shark pro
Re: Run time gone haywire
Man I am really screwing this up, sorry. Are you able to view the file?